GLF LOGÍSTICA (Panama) coordinates a 65.21-tonne turbine shaft transshipment

PANCO member GLF LOGÍSTICA in Panama coordinated the local transshipment of a 65.21-tonne industrial turbine shaft travelling from Guatemala to Brazil. The shaft measured 9.00 metres long, 2.72 metres wide and 2.80 metres high. GLF managed logistics planning, heavy transport equipment arrangements, port lifting and cargo movements, bringing together providers, port operators and technical teams.

GLF LOGÍSTICA, PANCO member in Panama, coordinated the transshipment of a 65.21-tonne industrial turbine shaft in Panama, on its journey from Guatemala to Brazil.

The shaft weighed 65,210 kg and measured 9.00 metres long, 2.72 metres wide and 2.80 metres high. Its weight and dimensions required specialised heavy transport equipment and coordinated port lifting and handling operations.

GLF managed the logistics planning, the arrangements for the heavy transport equipment and the coordination of port lifting and cargo movements. The team also brought together the providers, port operators and technical teams involved in the transshipment, with cargo safety and operational coordination central to the planning.

For overseas partners arranging heavy cargo movements through Panama, the project provides a concrete example of GLF’s role in coordinating the local handling and transshipment stages of an international shipment.

For more information, please visit https://www.glfcorp.com/.

Fast facts

Company
GLF LOGÍSTICA
Country
Panama
Network
PANCO
Cargo
Industrial turbine shaft weighing 65.21 tonnes (65,210 kg)
Route
Guatemala to Brazil, with transshipment in Panama
Dimensions
9.00 metres long, 2.72 metres wide and 2.80 metres high

What did GLF LOGÍSTICA coordinate in Panama?

GLF LOGÍSTICA coordinated the transshipment of a 65.21-tonne industrial turbine shaft during its journey from Guatemala to Brazil.

What were the turbine shaft’s weight and dimensions?

The shaft weighed 65,210 kg and measured 9.00 metres long, 2.72 metres wide and 2.80 metres high.

Why did the transshipment require specialised heavy transport equipment?

The shaft’s weight and dimensions required specialised heavy transport equipment and coordinated port lifting and handling operations.

What responsibilities did GLF LOGÍSTICA manage?

GLF managed logistics planning, heavy transport equipment arrangements, port lifting and cargo movements. The company also coordinated providers, port operators and technical teams, with cargo safety and operational coordination central to planning.

Related articles

Share

Ready to build relationships inside PANCO?

Apply to join PANCO and build relationships with active forwarders, specialist cargo partners and strong networking opportunities.

Apply to Join PANCO

PANCO Group

WhatsApp

Step 1 of 2 Contact details

Please share your contact details so we can send you the information you need.